Dear all,
You are receiving this message because you contacted our office regarding traffic congestion and pedestrian safety issues at Eglinton and Allen.
Metrolinx and their consultant, along with City transportation, have reviewed the options available to deal with what is a very challenging situation. Metrolinx has indicated that their contractor is not able to free up additional road space, which means managing traffic within those confines.
Our office is committed to continuing to work with residents, City staff, and Metrolinx to manage the pain as well as possible. We must brace ourselves for continued disruption in this neighbourhood for the next several years. But Metrolinx and the City must do what we can to ease the traffic congestion where we can.
The update from Metrolinx provided to our office is copied below for your information.
Update From Metrolinx:
Overview
Construction of extraction and launch shafts along Eglinton Avenue at Allen Road has added to the congestion that already exists through this area along Eglinton. Metrolinx is committed to continue to work closely with the City of Toronto, the TTC, local elected officials, and police to monitor the situation along Eglinton at Allen Road and to make modifications to the traffic configuration as required. Metrolinx is also committed to open, honest communication with the public and the local neighbourhood regarding the construction activities along Eglinton Avenue using a variety of communication tactics.
Background
Metrolinx has issued a contract for delivery of two tunnels from Black Creek to Yonge Street. Metrolinx’ contractor CTC submitted a permit application for roadway work in March 2013 that is valid until July 30 2014.
The full workzone set-up reduced the Eglinton and Allen Road way to one lane of traffic in each direction plus one right turn lane onto the northbound Allen Road on-ramp. It also included an adjustment to the signaling for the northbound ramp entrance.
During detailed design it was agreed between HMM and the City to allow a mixed use (vehicles and pedestrians) crossing on the northbound ramp to try and mitigate against the vehicle volume being lost due to losing one of the dedicated right turn lanes off Eglinton. Another reason for a mixed use turn was to prevent traffic heading east on Eglinton from backing up. This would quickly impact the southbound Allen ramp traffic.
Prior to January 31st, 2014 the full implementation of the traffic set-up in the vicinity of Allen Road and Eglinton was not in place as the full set-up was not yet required. Instead portions of the full work zone Stage 1 were gradually implemented in a number of phases as work zones were brought on line. The signaling design was included in the contract specification which the City had input to during design.
The signal change went into effect on January 31, 2014.
When the signal change was implemented it became apparent that the new signal configuration causes issues for pedestrians as both they and motorists are accustomed to separate signals.
Metrolinx has taken the following actions:
• booked paid duty officers to be at the intersection to keep pedestrians informed from now until Feb 16th. There should be officers there 24/7.
• alternative options include removing the pedestrian crossing or changing the signaling to make it a pedestrian only crossing
• requested a technical memo outlining further options from the engineering firm of record on the west tunnels contract to re-examine the intersection and prepare a Memo detailing a number of options to the current set-up.
Current Status
At this time, the current set up will be maintained and continue with 24/7 PDOs on duty ( until Feb 16th) to assist and educate pedestrians and/or drivers during this initial implementation.
Various on-street adjustments have and will also be addressed though additional signage, pavement scrubbing, and adjusting/repositioning of current traffic barrels and/or lanes of traffic.
Please feel free to contact our office should you have any questions. My contact information is below.
Sincerely,
Anthony Schein
Executive Assistant
Councillor Joe Mihevc - Ward 21, St. Paul's West
City Hall Office: 416 392 0208
Community Office: 416 392 7460
Direct: 416 338 5302
www.joemihevc.com
Twitter: @joemihevc Facebook.com/Joemihevc
I live in Ward 21 - St. Paul's - in the City of Toronto. I'm just an ordinary citizen, but once in a blue moon, I have something to say about my 'hood. So I'm putting my fingers where my mouth is and starting a blog. Feel free to share your thoughts about W21 too.
Tuesday, February 11, 2014
Sunday, February 9, 2014
Traffic Lights at Allen, Bathurst Secondary Effects
To: Crosstown <Crosstown@metrolinx.com>, Councillor Mihevc <councillor_mihevc@toronto.ca>

I note that excessive snow banks are now starting to be removed in some of the adjoining neighbourhoods. Thank you.
On
a related matter, I took some time to watch the traffic flow on
Eglinton Westbound. Clearly there is a problem if the traffic is being
backed up from the Allen to as far east as Avenue Road at peak times.One of the secondary effects is that several north-south streets are being blocked. This is particularly acute on Bathurst, where westbound drivers regularly block the intersection. One neighbour reported to me that she watched as the Bathurst 7 southbound bus took 20 minutes to travel two blocks (from under the Old Forest Hill bridge to the stop at Eglinton because the flow of traffic was halthed southbound by westbound drivers on Eglintion. I, and several of my concerned neighbours have now routinely seen traffic backed up from Eglinton to Glencairn as a result.
Standing on Eglinton, I can see that the problem is the traffic light sequence, especially the new set up at the Allen. Drivers now have to compete with pedestrians during the green light phase. The flow of cars from Eglintion westbound onto the Allen north is being bottlenecked. It strikes me that this is a perfect scenario for Point Duty officers during peak periods. I also think officers at Bathurst/Eglinton intersection would be helpful during peak periods as well.
I look forward to your response.
Snow banks, construction and traffic
Update: Excessive snow bank removal appears to now be underway.
On Feb. 7 I wrote to Metrolinx and Councilor Mihevc
I am a big supporter of the Crosstown initiative and understand there has to be some short term pain for the long term gain.
However, I think the City and Metrolinx needs to do a better job coordinating responses to the traffic situation. We are now seeing frustrated drivers blatantly breaking the law (for example, driving north bound on one way south-bound streets to avoid the lines going to north, especially on Glen Cedar). My biggest fear is that a child will be killed because no one is actually looking at the secondary effects.
And of course, the situation is exacerbated by the city's snow removal process. As I've said to Councilor Mihevc in the past, failure to remove the snow banks, especially near the schools in the area, is a significant risk at the best of times. Failure to remove them now is wreaking further havoc on traffic patterns caused by the Crosstown construction. Yesterday, I saw four vehicles become stuck in snow banks at the same time at an intersection on Chiltren because the traffic was so heavy and there is only one lane to drive due to the snow and as they tried to avoid each other, they got stuck in the snow and completely blocked traffic in all directions. And this was at school drop off time with many kids walking.
It's not very difficult to realize that by changing the traffic patterns on Eglinton, you are going to have secondary effects in the in adjoining neighbourhoods, and if you want to keep the traffic moving and not have pedestrians killed, you need to remove the snow, and not let city crews pile it up on both sides of the streets reducing every street to a single lane for both directions of traffic.
And if you don't believe me, I'd be happy to meet any Metrolinx or Councilor Office staff member for a walkabout and see the problems first hand.
Thank you for your attention to this matter.
On Feb. 7 I wrote to Metrolinx and Councilor Mihevc
Crosstown <Crosstown@metrolinx.com>, Councillor Mihevc <councillor_mihevc@toronto.ca> |
I am a big supporter of the Crosstown initiative and understand there has to be some short term pain for the long term gain.
However, I think the City and Metrolinx needs to do a better job coordinating responses to the traffic situation. We are now seeing frustrated drivers blatantly breaking the law (for example, driving north bound on one way south-bound streets to avoid the lines going to north, especially on Glen Cedar). My biggest fear is that a child will be killed because no one is actually looking at the secondary effects.
And of course, the situation is exacerbated by the city's snow removal process. As I've said to Councilor Mihevc in the past, failure to remove the snow banks, especially near the schools in the area, is a significant risk at the best of times. Failure to remove them now is wreaking further havoc on traffic patterns caused by the Crosstown construction. Yesterday, I saw four vehicles become stuck in snow banks at the same time at an intersection on Chiltren because the traffic was so heavy and there is only one lane to drive due to the snow and as they tried to avoid each other, they got stuck in the snow and completely blocked traffic in all directions. And this was at school drop off time with many kids walking.
It's not very difficult to realize that by changing the traffic patterns on Eglinton, you are going to have secondary effects in the in adjoining neighbourhoods, and if you want to keep the traffic moving and not have pedestrians killed, you need to remove the snow, and not let city crews pile it up on both sides of the streets reducing every street to a single lane for both directions of traffic.
And if you don't believe me, I'd be happy to meet any Metrolinx or Councilor Office staff member for a walkabout and see the problems first hand.
Subscribe to:
Posts (Atom)